Adres: 1308. SOKAK (ESKİ 78) 6 Z-15
Tel 1: 0 (312) 354 80-16
Faks:
Email 1: alihikmetugurlu@gmail.com
Web: https://www.ampyazilim.com.tr/
Turkey's first and only construction proposal program developed by considering the needs of construction and service companies doing business in the private sector and abroad!
Produced with current trends and technologies in software technology, with an aesthetically designed wearable interface, easy to use and flexible reporting features, it is exactly as it should be.
With AMP Construction Bid designed by civil engineers, it is now very easy to do real bid work.
The system that solves all the disadvantages of Excel!
Importing data from Excel and exporting data to Excel when necessary
You can make nested or interconnected calculations that you can't solve or follow in Excel, and you can do as much detailed work as you want in the form of a tree structure, whether in analyzes or workgroups. This feature is very important for bid work and you won't find it in any other software. Even if your offer consists of thousands of items, you can calculate your offer very quickly and accurately by going step by step.
Multi-currency support in Unit Price and Markets
You can store the prices of the Current and Poses in different currencies and convert them to the currency of the offer with the rate entered at the calculation stage.
Special Unit Price and Analysis Books
You can create books for your own market, pose and analysis and use them as you wish.
Pose Search Engine
You can quickly search and find a pose in the pose number, description and recipe information and use it wherever you want.
Detailed Exposure Information
You can access and use the Description, Description and Analysis information of the poses from anywhere.
You can make detailed and easy quantities with advanced production quantity and iron quantity editors.
With the Overhead Calculation module, which affects the proposal other than the direct cost items, you can calculate the general expenses and add them to the proposal or distribute them to the work items in the proposal.
With the quantity analysis module, you can calculate the quantities of labor, machinery, equipment and materials used in the analysis in the offer and in the offer itself, with a few clicks. Example; you can determine how many hours of flat workers, how many hours of masonry you need to work on the project or how much cement you need to buy with a few clicks.
The program can work in a network environment, at the same time, on the same project, in different workgroups with multiple users (Civil Eng. Architect, Mechanical Eng. Elec. Eng.) and common information is instantly shared.
Identifying projects that users can work on with project-based authorization
To be able to make direct and non-transfer analysis with the help of analysis editor, to use analyzes as sub-analysis within each other. Detection of vicious circles that may occur due to nested use by the program and warning the user
Entering the unit prices of the items on the basis of date without the restriction of entering a single unit price for each year and storing the price based on the date. Opportunity to trade with current market prices at any time. No need to delete old unit prices as new unit prices are added
Possibility to create unit price files on the basis of country / region / city to be used in each project
The right to use the unit price and analysis data of the Ministry of Environment and Urbanization and other official institutions under license when needed.
The program interface and reports can be used in either English or Turkish. (The Turkish Official Institution Unit Price books installed in the program are only in Turkish.)